The work to extend the green line to the new transit center in Torrance continues.

Metro has provided more information on the four alternative routes being studied. The presentation shows the first two alternative routes will follow the existing right of way through Redondo Beach and Lawndale en route to Torrance. The other alternative route would be along Hawthorne Blvd with aerial segments connecting tracks to the existing right of way.

This summer, Metro will recommend routes to the Metro Board of Directors.

The project is scheduled to break ground in 2026.

Advertisements